Routes by class
| Category | Self-assessment (Module A) | Third-party routes | Article |
|---|---|---|---|
| Default | Yes | Optional: Module B+C, Module H, or a European cybersecurity certification scheme where available | 32(1) |
| Important, Class I | Only if harmonised standards, common specifications or a certification scheme at assurance level "substantial" or higher are applied in full | Module B+C or Module H in every other case | 32(2) |
| Important, Class II | No | Module B+C, Module H, or a certification scheme at "substantial" or higher where available | 32(3) |
| Critical | No | A European cybersecurity certificate where a delegated act under Article 8(1) requires one; otherwise the Class II routes | 8(1), 32(4) |
Class follows the product's core functionality (Article 7(1)). Find yours with the class checker or the product category pages.
The modules in Annex VIII
- Module A, internal controlYou draw up the technical documentation, make sure design, development, production and vulnerability handling ensure compliance, affix the CE marking and draw up the declaration on your sole responsibility (Annex VIII, Part I).
- Module B, EU-type examinationA notified body of your choice examines the technical documentation and supporting evidence, checks specimens, tests where needed, and issues an EU-type examination certificate. It also carries out periodic audits of your vulnerability handling (Annex VIII, Part II, points 3 to 8).
- Module C, conformity to typeAfter Module B, you make sure production matches the approved type and declare conformity for the product model (Annex VIII, Part III).
- Module H, full quality assuranceYou operate a quality system approved by a notified body for design, development, final inspection, testing and vulnerability handling, under its surveillance throughout the support period (Annex VIII, Part IV).
Why most Class I products need a notified body today
Self-assessment for Class I depends on standards or schemes that do not yet exist in usable form. No CRA harmonised standard had been cited in the Official Journal as of 23 November 2026. On 10 November 2026 the Commission extended the standardisation deadlines by three months: the horizontal standards on secure design and on vulnerability handling are now due by 30 November 2026, and the product-specific vertical standards by 31 January 2027. Presumption of conformity starts only when references are published in the Official Journal (Article 27(1)).
Certification schemes count only once the Commission names them by delegated act under Article 27(9). The Commission plans one for the EUCC Common Criteria scheme, listed for Q4 2026 on its implementation timeline. None had been adopted as of 23 November 2026, and no Article 8(1) act requiring certification for critical products had been adopted either.
Notified bodies
Rules on notifying conformity assessment bodies have applied since 11 June 2026 (Article 71(2)). Member states should strive to have enough notified bodies by 11 December 2026 (Article 35(2)). When we checked the Commission's NANDO database on 23 November 2026, the CRA was listed with Module B+C and Module H procedures set up, and zero notified bodies under it. Some labs say on their own sites that they are preparing; those claims are on the notified bodies page.
Fees and small companies
Conformity assessment fees must take account of micro, small and medium-sized enterprises and be reduced proportionately (Article 32(6)). Published estimates of notified body fees are on the cost page.
Open source in Annex III
Free and open-source products in Annex III categories can use any Article 32(1) route, including Module A, if the technical documentation is made public when the product is placed on the market (Article 32(5)).
Plan backwards from 11 December 2027
A third-party route has to finish before you place new units on the market from 11 December 2027. With no notified body listed yet, booking capacity early is the main schedule risk for Class II, critical and most Class I products. The Commission guidance discusses conformity assessment for important and critical products in its section 6.2.
Common questions
Can a Class I product self-assess today?
Only by applying harmonised standards, common specifications or a qualifying certification scheme in full (Article 32(2)). None of those was available for the CRA as of 23 November 2026, so a notified body route is the practical default.
Does an EUCC certificate count under the CRA yet?
Not yet. Article 27(9) needs a delegated act naming the schemes that can be used. The Commission plans one for EUCC; none had been adopted as of 23 November 2026.
Do default products ever need a notified body?
No. They can self-assess under Module A, though they may choose a third-party route (Article 32(1)).
Sources
- Regulation (EU) 2024/2847 (Cyber Resilience Act), Official Journal text
- Commission Implementing Regulation (EU) 2025/2392, technical descriptions of important and critical products
- European Commission, CRA conformity assessment
- European Commission, CRA standardisation
- European Commission, Cyber Resilience Act implementation timeline
- European Commission, Single Market Compliance Space: notified bodies (NANDO)
- Commission guidance on the application of the CRA, C/2026/6013 (OJ C, 17 November 2026)