Each guide answers one question about Regulation (EU) 2024/2847 for a US company that makes connected devices or software sold in the EU. Every page opens with a short answer, cites the article it relies on, and lists its sources. Where the Commission's guidance of 2026 explains an article, we cite the paragraph. Where something is not settled, the page says so.
If you are new to the regulation, start with what the EU CRA is, then run the class checker for your product and work through the compliance checklist. The guides below go one level deeper, article by article.
Scope and roles
- Which products does the Cyber Resilience Act cover?The Article 2 test, the cloud boundary, commercial activity and every exclusion
- What do the key terms in the Cyber Resilience Act mean?The 24 Article 3 definitions a US maker uses most, in plain English
- What does Article 13 require of manufacturers?Risk assessment, component due diligence, support period, records and labelling
- Do US device makers need an EU authorised representative for the CRA?What Article 18 says and what EU importers must check
- What must EU importers check under the CRA?The Article 19 checks your EU importer will ask you to prove
- What do distributors have to do under the CRA?Article 20 checks, and when a reseller becomes the manufacturer
- What does the CRA require of open-source software stewards?The light-touch regime for foundations and companies that sustain open source
Product requirements
- What are the EU CRA requirements in Annex I?All 13 product security requirements in Annex I, Part I
- What vulnerability handling does the CRA require?The eight Part II requirements, upstream reporting and update availability
- What information must ship with a product under the CRA?The nine Annex II items, language rules and the 10-year availability rule
- How long is the support period under the CRA?Why five years is a floor, and how the end date is shown
- What does the EU CRA require for an SBOM?Format, depth, who sees it and the status of the format act
Conformity and market access
- What goes in a CRA EU declaration of conformity?The eight Annex V items, the simplified version and how long to keep it
- How does CE marking work under the Cyber Resilience Act?Where the mark goes on hardware, packaging and software
- What must CRA technical documentation contain?The eight Annex VII elements and how long to keep them
- Which conformity assessment route does my product need?Module A, B+C and H by class, and where notified bodies stand
- Does the CRA apply to products already on the market?Existing products, legacy designs, software versions and old certificates
- When is a product update a substantial modification under the CRA?When updates, repairs and new features make a product new again
Reporting and enforcement
- What must device makers report under the CRA, and how fast?The 24-hour, 72-hour and final report clock, live since September 2026
- What are the fines under the Cyber Resilience Act?The three tiers, the carve-outs and national enforcement so far
- Who enforces the CRA, and what can they do?National authorities, document requests, sweeps and recalls
Article index
Where each article and annex a US maker deals with is explained on this site.
| Article or annex | Topic | Guide |
|---|---|---|
| Article 2 | Scope and exclusions | /guides/scope/ |
| Article 3 | Definitions | /guides/definitions/ |
| Article 13 | Manufacturer obligations | /guides/manufacturer-obligations/ |
| Article 14 to 16 | Reporting and the Single Reporting Platform | /guides/reporting/ |
| Article 18 | Authorised representatives | /guides/authorised-representative/ |
| Article 19 | Importers | /guides/importers/ |
| Articles 20 to 23 | Distributors, and when others become the manufacturer | /guides/distributors/ |
| Articles 24 and 25 | Open-source software stewards | /guides/open-source-stewards/ |
| Articles 27 and 32 | Presumption of conformity and conformity assessment | /guides/conformity-assessment/ |
| Article 28, Annexes V and VI | EU declaration of conformity | /guides/declaration-of-conformity/ |
| Articles 29 and 30 | CE marking | /guides/ce-marking/ |
| Article 31, Annex VII | Technical documentation | /guides/technical-documentation/ |
| Articles 52 to 60 | Market surveillance | /guides/market-surveillance/ |
| Article 64 | Penalties | /guides/penalties/ |
| Article 69 | Transitional provisions | /guides/transitional-provisions/ |
| Article 3(30), 21, 22 | Substantial modification | /guides/substantial-modification/ |
| Article 13(8) to 13(11) | Support period | /guides/support-period/ |
| Annex I, Part I | Essential cybersecurity requirements | /guides/essential-requirements/ |
| Annex I, Part II | Vulnerability handling | /guides/vulnerability-handling/ |
| Annex I, Part II(1) | Software bill of materials | /guides/sbom/ |
| Annex II | Information and instructions to the user | /guides/user-information/ |
| Article 71 | Entry into force and application dates | /deadlines/ |
| Annexes III and IV | Important and critical product categories | /products/ |
How these guides are checked
We read the official text published by the EU Publications Office, the Commission's guidance C/2026/6013 published in the Official Journal on 17 November 2026, and the Commission and ENISA pages on reporting, standards and conformity assessment. National implementation facts come from government and parliament sites. Secondary sources are labelled as such. The full method is on the methodology page.