| CRA status | Default (our reading) |
|---|---|
| Basis | Not in Annex III or IV; guidance section 8.3.4 |
| Notified body needed | No: Module A self-assessment (Article 32(1)(a)) |
| Standard requested | Horizontal items 1 to 15 only (items 1 and 15 due 30 Nov 2026, items 2 to 14 due 30 Oct 2027) |
| Dates | Article 14 reporting since 11 Sep 2026, including units already sold; everything else for new units from 11 Dec 2027 |
Next step for your product: find it in the CRA product matrix, run the class checker, or get a free shortlist of firms that do this work.
What the official texts say
"The absence of this data processing would prevent the industrial robot from picking up parts, hence from performing one of its functions."
Commission guidance C/2026/6013, section 8.3.4, Industrial robot, EUR-Lex
Which industrial robots are in which class?
| Version or part | CRA status | Why | Basis |
|---|---|---|---|
| Industrial robot or cobot with a controller | Default | Not listed | Our reading |
| The maker's cloud vision or planning service | Part of the robot | Section 8.3.4 | Guidance |
| Third-party IaaS under that service | Not part of the product | Documented, with due diligence | Guidance |
| Robot controller or software sold on its own | Its own product | Default in our reading | Our reading |
| Machinery with a cloud back end rearchitected later | Substantial modification, same support period | Example 55 | Guidance |
What must be documented about the cloud?
The guidance says the robot maker documents the remote data processing and the reliance on the third-party infrastructure in the technical documentation, considers both in the risk assessment and applies the essential requirements to the robot including that service (section 8.3.4).
Does rebuilding the cloud back end change the support period?
Not by itself. In Example 55 a machinery maker rearchitects the cloud back end with new APIs and data flows; that is a substantial modification, but the expected use time stays the same, so the support period of the modified product follows the original expected use time.
Which route applies?
A default product can always use the internal control procedure, Module A, under Article 32(1)(a): the manufacturer assesses the product itself, draws up the technical documentation, signs the EU declaration of conformity and affixes the CE marking. No notified body is needed. The Commission's guidance says so in terms: "Notably, products with digital elements in the default category can always rely on the internal control procedure based on module A ('self-assessment')" (point 137).
Do the radio rules apply?
Only if a version of the product has a radio. The Radio Equipment Directive's cybersecurity rules, Delegated Regulation (EU) 2022/30, apply to radio equipment that can communicate over the internet. A wired-only product (Ethernet, fieldbus) is not radio equipment and is outside them. Where they do apply, they stop on 11 December 2027, when Delegated Regulation (EU) 2026/339 repeals 2022/30 and the CRA takes over. See the CRA and the RED delegated act.
What to do before 11 December 2027
- Confirm the classCheck the product against Annex III and IV and record why it is a default product; keep the reasoning with the technical documentation.
- Report from nowArticle 14 has applied since 11 September 2026, including for units already on the market.
- Assess the risksRun the cybersecurity risk assessment and an Annex I gap analysis, including the app and the cloud service the product needs.
- Set the support periodAt least five years unless the product is expected to be in use for less (Article 13(8)), with an SBOM and a disclosure policy.
- Self-assessModule A: technical documentation (Annex VII), EU declaration of conformity and CE marking before new units go on the EU market from 11 December 2027.
Reports go through ENISA's Single Reporting Platform; the Commission explains the routes on its CRA conformity assessment page.
Not sure where your product lands? Look it up in the CRA product matrix, run the class checker, see every device on CRA class by device type, or read the 2027 CRA deadlines and cost report.
Common questions
Are industrial robots covered by the Cyber Resilience Act?
Yes. A connected robot is a product with digital elements; in our reading it is a default product that can self-assess under Module A.
Is a robot's cloud service part of the product under the CRA?
Yes, when the maker designed it and the robot needs it: the guidance's section 8.3.4 calls it remote data processing that belongs in the technical documentation.
Does an industrial robot need a notified body?
No, in our reading: robots are not in Annex III or IV, so Module A self-assessment is open.