| CRA status | Default (our reading) |
|---|---|
| Basis | Not in Annex III or IV; guidance Examples 39 and 56 |
| Notified body needed | No: Module A self-assessment (Article 32(1)(a)) |
| Standard requested | Horizontal items 1 to 15 only (items 1 and 15 due 30 Nov 2026, items 2 to 14 due 30 Oct 2027) |
| Dates | Article 14 reporting since 11 Sep 2026, including units already sold; everything else for new units from 11 Dec 2027 |
Next step for your product: find it in the CRA product matrix, run the class checker, or get a free shortlist of firms that do this work.
What the official texts say
"In both cases, the replacement falls within the scope of the exemption in Article 2(6), whether the replacement concerns a component within the PLC, or the PLC as a whole."
Commission guidance C/2026/6013, Example 39, EUR-Lex
"The Article 13(8) criteria therefore indicate a longer expected use time, and the manufacturer recalculates the support period for that specific PLC accordingly."
Commission guidance C/2026/6013, Example 56, EUR-Lex
Which PLCs are in which class?
| Version or part | CRA status | Why | Basis |
|---|---|---|---|
| PLC or remote I/O with Ethernet or fieldbus | Default | Not listed | Our reading |
| Managed industrial switch | Important, Class I | Switches with a management plane, Annex III, point 12 | Text |
| Industrial firewall, IDS or IPS | Important, Class II | Annex III, Class II, point 2 | Text |
| Identical replacement PLC or CPU sold as a spare | Outside | Spare parts exemption, Article 2(6) (Example 39) | Text and guidance |
| Industrial sensor for trusted environments | Default | Example 66: physical-attack risks handled by limiting the intended purpose | Guidance; class is our reading |
| PLC programming software sold on its own | Its own product | Default in our reading | Our reading |
Are spare PLCs covered?
Not when they are identical spares. Article 2(6) excludes spare parts made to the same specifications as the components they replace, and the guidance's Example 39 applies that to a replacement CPU and to a complete replacement PLC supplied through the after-sales channel for an identified system.
How long must a PLC be supported?
For its expected use time, at least five years (Article 13(8)). The guidance's Example 56 adds that replacing the PLC's embedded computing platform with longer-lived components can change reasonable user expectations, so the manufacturer recalculates the support period for that PLC.
What about an industrial sensor without physical protection?
The guidance's Example 66 accepts limiting the intended purpose instead:
"To mitigate the associated risks identified in the risk assessment, the manufacturer limits the sensor's intended purpose to use only in trusted environments where unauthorised physical access to the product with digital elements is prevented."
Commission guidance C/2026/6013, Example 66, EUR-Lex
How does IEC 62443 fit?
IEC 62443 is not a CRA harmonised standard, but it covers much of the same ground for industrial products. See the CRA and IEC 62443.
Do the radio rules apply?
Only if a version of the product has a radio. The Radio Equipment Directive's cybersecurity rules, Delegated Regulation (EU) 2022/30, apply to radio equipment that can communicate over the internet. A wired-only product (Ethernet, fieldbus) is not radio equipment and is outside them. Where they do apply, they stop on 11 December 2027, when Delegated Regulation (EU) 2026/339 repeals 2022/30 and the CRA takes over. See the CRA and the RED delegated act.
What to do before 11 December 2027
- Confirm the classCheck the product against Annex III and IV and record why it is a default product; keep the reasoning with the technical documentation.
- Report from nowArticle 14 has applied since 11 September 2026, including for units already on the market.
- Assess the risksRun the cybersecurity risk assessment and an Annex I gap analysis, including the app and the cloud service the product needs.
- Set the support periodAt least five years unless the product is expected to be in use for less (Article 13(8)), with an SBOM and a disclosure policy.
- Self-assessModule A: technical documentation (Annex VII), EU declaration of conformity and CE marking before new units go on the EU market from 11 December 2027.
Reports go through ENISA's Single Reporting Platform; the Commission explains the routes on its CRA conformity assessment page.
Not sure where your product lands? Look it up in the CRA product matrix, run the class checker, see every device on CRA class by device type, or read the 2027 CRA deadlines and cost report.
Common questions
Is a PLC an important product under the Cyber Resilience Act?
No. PLCs are not listed in Annex III or IV, so in our reading they are default products that can self-assess under Module A.
Are replacement PLCs covered by the CRA?
Not identical spares: Article 2(6) excludes them, and the guidance's Example 39 applies that to a replacement CPU or a complete identical PLC.
Is an industrial switch Class I under the CRA?
Yes, if it has a management plane: switches are Annex III, Class I, point 12. Industrial firewalls are Class II.
Sources
- Regulation (EU) 2024/2847 (Cyber Resilience Act), Official Journal text
- Commission guidance on the application of the CRA, C/2026/6013 (OJ C, 17 November 2026)
- Commission Implementing Regulation (EU) 2025/2392, technical descriptions of important and critical products
- European Commission, CRA conformity assessment
- ENISA, CRA Single Reporting Platform