The official description
Implementing Regulation (EU) 2025/2392, in force since 21 December 2025, gives the technical description the Commission uses for this category. It reads:
Software products with digital elements that provide an abstract interface of the underlying hardware and control the execution of software, and that may provide services such as computing resource management and configuration, scheduling, input-output control, managing data, and providing an interface through which applications interact with system resources and peripherals.
- Category
- Operating systemsAnnex III, point 11
- Class
- Important, Class IArt. 7
- Examples named
- Real-time operating systems, general-purpose and special-purpose operating systemsImplementing Regulation (EU) 2025/2392
- Standard requested
- Item 26 of the CRA standardisation request, due from the standards bodies by 31 January 2027C(2026) 7861, Annex I
- Planned deliverable
- ETSI EN 304 626, possibly in several partsM/606 work programme, April 2025
- Applies in full
- 11 December 2027Art. 71(2)
Which conformity route applies
| Route | What it involves | Article |
|---|---|---|
| Self-assessment (Module A) | Only if a harmonised standard, common specification or certification scheme at assurance level substantial or higher is applied in full | Art. 32(2) |
| EU-type examination (Module B) then Module C | Notified body examines the design; you then control production | Art. 32(2)(a) |
| Full quality assurance (Module H) | Notified body approves and monitors your quality system | Art. 32(2)(b) |
Where things stand. Self-assessment needs a harmonised standard cited in the Official Journal, and none had been cited on 23 November 2026. NANDO listed no notified bodies under the CRA on the same date. If that is still the position when you place new units on the market from 11 December 2027, a Class I product will need a notified body.
Is your product in this category?
Class follows core functionality: the product's main features and technical capabilities, without which it would not meet its intended purpose (Article 7(1); Commission guidance, point 139). A product can perform other functions and still have this core functionality, and a product that merely integrates a component from this category is not in it because of that component (Article 7(1); Implementing Regulation (EU) 2025/2392, recitals 3 to 5). A product has only one core functionality for classification (guidance, point 144).
- What countsSoftware that provides an abstract interface to the hardware and controls software execution, with services such as resource management, scheduling, input-output control and data management. Real-time, general-purpose and special-purpose operating systems are named.
- Devices that run oneThe Commission's Example 58: a smartphone integrates an operating system, but its core functionality is communication and access to services, so the phone is not an operating system. The same logic applies to connected devices.
- Selling the OSExample 57 describes a software product that abstracts hardware and manages execution: it has the core functionality of an operating system. If you license an RTOS or a Linux distribution to device makers, that product is Class I.
- Open sourceFree and open-source software in this category can use any route in Article 32(1), self-assessment included, provided the technical documentation is made public when the product is placed on the market (Article 32(5)). Example 17: a free OS with a paid version that includes support services is placed on the market in the course of a commercial activity.
What changes on 11 December 2027
- New unitsMust meet the essential requirements in Annex I, Parts I and II, and pass the conformity route above before they are placed on the EU market (Article 13, 32).
- PaperworkTechnical documentation under Annex VII, an EU declaration of conformity and the CE marking, followed by the notified body number where Module H is used (Article 28, 30(4), 31).
- Support periodAt least five years unless the product is expected to be in use for less, with the end date shown at purchase (Article 13(8), 13(19)). See support period.
- Units already soldProducts placed on the market before that date are covered only if substantially modified afterwards, but Article 14 reporting already applies to them (Article 69(2), 69(3)).
What a US maker should do now
- Confirm the classWrite down the core functionality and check it against the description above. The class checker walks through scope, exclusions and class.
- Plan for the routeFor this class, assume third-party assessment unless a harmonised standard is cited and you apply it in full. Ask test labs and future notified bodies about capacity early.
- Report nowSet up Article 14 reporting through ENISA's Single Reporting Platform: 24 hours for an early warning on an actively exploited vulnerability. See reporting.
- Start the fileBegin the risk assessment, the SBOM and the vulnerability handling process. The Annex I checklist lists every requirement.
Common questions
Does a product that contains one of these become Important, Class I?
No, not by that fact alone. Article 7(1) says integrating a product with the core functionality of an Annex III category does not in itself make the host product subject to the stricter procedures, and the Commission applies the same logic to Annex IV (guidance, point 141).
Can we sell units we already ship after 11 December 2027 without changes?
Units placed on the market before 11 December 2027 are covered only if substantially modified afterwards (Article 69(2)). New units placed on the market from that date must comply. Reporting under Article 14 applies to all units since 11 September 2026 (Article 69(3)).
Sources
- Regulation (EU) 2024/2847 (Cyber Resilience Act), Official Journal text
- Commission Implementing Regulation (EU) 2025/2392, technical descriptions of important and critical products
- Commission guidance on the application of the CRA, C/2026/6013 (OJ C, 17 November 2026)
- Commission Implementing Decision C(2026) 7861 amending the CRA standardisation request, Annex I (10 November 2026)
- CEN, CENELEC and ETSI, M/606 work programme for the CRA, version 1 (2 April 2025)
- European Commission, Single Market Compliance Space: notified bodies (NANDO)