CRA for Devices

Are smart meter gateways critical products under the EU CRA?

Yes. Smart meter gateways are critical products, Annex IV, point 2 of Regulation (EU) 2024/2847. Until a delegated act requires certification, the Class II routes apply from 11 December 2027: Module B+C, Module H or a certification scheme. Article 14 reporting already applies.

Reviewed November 2026. 7 sources listed at the end of the page.

The official description

Implementing Regulation (EU) 2025/2392, in force since 21 December 2025, gives the technical description the Commission uses for this category. It reads:

Smart meter gateways are products with digital elements that control communication between components in or connected to smart metering systems as defined in Article 2(23) of Directive (EU) 2019/944, and authorised third parties, such as utility providers. Smart meter gateways collect, process and store meter or personal data, protect data and information flows by supporting specific cryptographic needs, such as encryption and decryption of data, incorporate firewalling functionalities and provide the means to control other devices.

Category recordOfficial
Annex IV to Regulation (EU) 2024/2847 · Critical · point 2
Category
Smart meter gateways within smart metering systems as defined in Article 2(23) of Directive (EU) 2019/944 of the European Parliament and of the Council and other devices for advanced security purposes, including for secure cryptoprocessingAnnex IV, point 2
Class
CriticalArt. 8
Examples named
Smart meter gateways related to smart metering systems measuring electricity as defined in Article 2(23) of Directive (EU) 2019/944. It may also include smart meter gateways used in other smart metering systems measuring consumption of other sources of energy such as gas or heat, provided that the gateway meets this descriptionImplementing Regulation (EU) 2025/2392
Standard requested
Item 40 of the CRA standardisation request, due from the standards bodies by 31 January 2027C(2026) 7861, Annex I
Planned deliverable
A standard from CEN-CLC/JTC 13 WG 6M/606 work programme, April 2025
Applies in full
11 December 2027Art. 71(2)
Taken from the official texts. The examples are illustrative, not a complete list (Implementing Regulation (EU) 2025/2392, recital 7).

Which conformity route applies

RouteWhat it involvesArticle
European cybersecurity certificateRequired only where a delegated act under Article 8(1) says so. None adopted as of 23 November 2026Art. 8(1), 32(4)(a)
Otherwise the Class II routesModule B+C, Module H, or a certification scheme at substantial or higherArt. 32(4)(b), 32(3)

Where things stand. No certification is mandatory yet, so the Class II routes apply. NANDO listed no notified bodies under the CRA on 23 November 2026, and member states should strive to have enough of them by 11 December 2026 (Article 35(2)).

Is your product in this category?

Class follows core functionality: the product's main features and technical capabilities, without which it would not meet its intended purpose (Article 7(1); Commission guidance, point 139). A product can perform other functions and still have this core functionality, and a product that merely integrates a component from this category is not in it because of that component (Article 7(1); Implementing Regulation (EU) 2025/2392, recitals 3 to 5). A product has only one core functionality for classification (guidance, point 144).

  • What countsProducts that control communication between components in or connected to smart metering systems, as defined in Article 2(23) of Directive (EU) 2019/944, and authorised third parties such as utilities. They collect, process and store meter or personal data, support cryptographic needs, incorporate firewalling and can control other devices.
  • Gas and heatThe category centres on electricity metering but may include gateways in gas or heat metering systems that meet the description.
  • Other devicesThe Annex IV entry also covers other devices for advanced security purposes, including for secure cryptoprocessing. The implementing regulation's technical description addresses smart meter gateways and gives no separate description of those other devices.
  • Route todayNo Article 8(1) delegated act requires certification yet, so the Class II routes apply (Article 32(4)(b)).

What changes on 11 December 2027

  • New unitsMust meet the essential requirements in Annex I, Parts I and II, and pass the conformity route above before they are placed on the EU market (Article 13, 32).
  • PaperworkTechnical documentation under Annex VII, an EU declaration of conformity and the CE marking, followed by the notified body number where Module H is used (Article 28, 30(4), 31).
  • Support periodAt least five years unless the product is expected to be in use for less, with the end date shown at purchase (Article 13(8), 13(19)). See support period.
  • Units already soldProducts placed on the market before that date are covered only if substantially modified afterwards, but Article 14 reporting already applies to them (Article 69(2), 69(3)).

What a US maker should do now

  • Confirm the classWrite down the core functionality and check it against the description above. The class checker walks through scope, exclusions and class.
  • Plan for the routeFor this class, assume third-party assessment unless a harmonised standard is cited and you apply it in full. Ask test labs and future notified bodies about capacity early.
  • Report nowSet up Article 14 reporting through ENISA's Single Reporting Platform: 24 hours for an early warning on an actively exploited vulnerability. See reporting.
  • Start the fileBegin the risk assessment, the SBOM and the vulnerability handling process. The Annex I checklist lists every requirement.

Common questions

Does a product that contains one of these become Critical?

No, not by that fact alone. Article 7(1) says integrating a product with the core functionality of an Annex III category does not in itself make the host product subject to the stricter procedures, and the Commission applies the same logic to Annex IV (guidance, point 141).

Can we sell units we already ship after 11 December 2027 without changes?

Units placed on the market before 11 December 2027 are covered only if substantially modified afterwards (Article 69(2)). New units placed on the market from that date must comply. Reporting under Article 14 applies to all units since 11 September 2026 (Article 69(3)).

Get a shortlist of firms for your product

Send a short product brief. We reply by email with firms that do CRA assessment, documentation, testing or tooling work for products like yours, with the prices they publish and where we found them.

Free for makers. Prefer email? Write to

Product brief

Free for makers. We use your details only to reply. Your brief goes to no firm unless you ask for an introduction.